Kingston Ash Slide
Ash Removal Plan
Listed below are the documents of the proposed Phase I Ash Removal Plan that has been submitted to the Tennessee Department of Environment and Conservation, the EPA and the U.S. Army Corps of Engineers for their approval.
Dredge Plan
Revised Phase I Dredge Plan (Phase I is removal from the navigation channel only to get the bulk out of the river and to reduce flood risk)
Related Plans/Documents
Dust Control and Suppression Action Plan
Accident Prevention Plan
Map of project areas (Sections shown in order of dredging)
Revised Ash Processing Area Plan
Revised Quality Assurance Project Plan