The Tennessee Valley Authority is working with the Environmental Protection Agency to recover the site of the Kingston Fossil Plant ash spill. As part of that process, important site documents have been placed in the Administrative Record and are available for public review. The Administrative Record includes documents that form the basis for the selection of the methods TVA is using to remove ash from the river and area east of Dike 2. Documents in the Administrative Record may include, but are not limited to, inspection reports, test results, the Action Memorandum, and work plans. All interested persons are encouraged to review the documents.
These same documents are available on computer disk at the
following location:
TVA conducts public comment periods to solicit public input on important site documents and the site recovery process. To find out what public comment periods are in process and how to participate, please click here.
|
|
|
|
|
| Nbr |
Date |
Author Agency |
Title |
Pages |
| TC1 |
Feb. 2009 |
Shaw Environmental, Inc. |
Phase I Emory River Dredging Plan Kingston Fossil Plant Ash Recovery Project |
50 |
| TC2 |
02/24/2009 |
TVA |
RE: KIF Ash Processing Area Wick Drains |
1 |
| TC2-2 |
02/24/2009 |
TVA |
RE: KIF Ash Processing Area Wick Drains |
|
| TC3 |
02/25/2009 |
TDEC |
Tennessee Valley Authority (TVA) Kingston Fossil Plant (KIF) - Commissioner's Order, Case No. OGC09-0001- Request for Use of Wick Drains in Ash Processing Area |
7 |
| TC4 |
02/25/2009 |
TDEC |
RE: Phase I Emory River Dredging Plan and Ash Processing/Temporary Storage Facility - Approval under Commissioner's Order OGC09-001 |
1 |
| TC5 |
Mar-2009 |
TVA |
Kingston Fossil Plant - Fly Ash Recovery Projecct - Sampling Plan for Phase 1 Dredging Operations |
60 |
| TC6 |
03/02/2009 |
TDEC |
Re : Phase 1 Emory River Dredging Plan and Ash Processing/Temporary Storage Facility - Approval under Commissioner's Order OGC09-0001 |
1 |
| TC7 |
03/03/2009 |
TDEC |
RE: TDEC Response letter - TVA dredging plan |
1 |
| TC8 |
03/18/2009 |
Environmental Standards, Inc. |
Quality Assurance Project Plan - Phase 1 Emory River Dredging - Kingston Fossil Plan Ash Recovery Project |
146 |
| TC9 |
03/19/2009 |
EPA |
Re: EPA Approval of sampling plan and QAPP for Phase 1 Dredging Plan.txt |
1 |
| TC10 |
03/20/2009 |
TVA |
Tennessee Valley Authority (TVA) - Commissioner's Order, Case Number OGC09-0001 - Request for Authorization to use Polymers to Enhance Treatment of Dredge Return Water |
21 |
| TC11 |
05/04/2009 |
TVA/Jacobs |
Ash Loading Test Plan |
11 |
| TC12 |
05/07/2009 |
TDEC |
Response to Comments of the Ash Loading Test |
1 |
| TC13 |
05/22/2009 |
TVA |
Railcar Unloading Operation Work Plan |
3 |
| TC14 |
05/22/2009 |
TVA |
Rail Spur Construction Work Plan |
26 |
| TC15 |
05/22/2009 |
TVA |
Ash Movement East of Dike #2 Work Plan |
4 |
| TC16 |
05/22/2009 |
TVA |
Construction/Implementation of Barge Offloading Area Work Plan |
6 |
| TC17 |
05/22/2009 |
TVA |
Work Plan for Dredge Relocation R0 |
5 |
| TC18 |
05/29/2009 |
TVA |
Access Channel Construction and Debris Removal Operations Work Plan |
7 |
| TC19 |
06/09/2009 |
TVA |
Time Critical Land-Based Ash Removal East of Dike #2 Work Plan |
5 |
| TC20 |
06/10/2009 |
TVA |
Test Embayment Program |
168 |
| TC21 |
06/09/2009 |
TVA |
Ash Stacking Height in Processing Area Work Plan |
2 |
| TC22 |
06/19/2009 |
TVA |
Cenosphere Collection Area Consolidation Work Plan |
5 |
| TC23 |
06/19/2009 |
TVA |
Swan Pond Embayment Sampling Plan |
7 |
| TC24 |
06/19/2009 |
TVA |
Clean Water Ditch in the East Embayment Work Plan |
4 |
| TC25 |
06/22/2009 |
TVA |
Loading Work Plan |
6 |
| TC26 |
06/30/2009 |
TVA |
Time Critical Land-Based Ash Removal East of Dike #2 Work Plan (Revised) |
13 |
| TC27 |
06/30/2009 |
TDEC |
Disposal of Coal Ash Generated during the TVA Kingston Coal Ash Response |
4 |
TC28 |
07/02/2009 |
TVA |
Offsite Ash Disposal Options Plan |
20 |
| TC29 |
07/13/2009 |
TVA |
Rim Ditch Hydraulic Improvements Work Plan |
5 |
| TC30 |
07/20/2009 |
TVA |
Rim Ditch Structural Improvements Work Plan |
7 |
| TC31 |
07/20/2009 |
TVA |
Phase I Facility Assessments for Coal Combustion Product Impoundments and Disposal Facilities in AL, KY and TN |
3 |
| TC32 |
08/03/2009 |
Jacobs, for TVA |
Revised Site Dredging Plan July 2009 with Attachments |
188 |
| TC33 |
08/05/2009 |
TVA |
Final Revised Action Memo with ARARs |
23 |
| TC34 |
08/14/2009 |
TVA |
Revised Temporary Ash Stockpile |
94 |
| TC35 |
09/15/2009 |
TVA |
Wet Ash Storage to Support Time Critical Land Signed Version |
6 |
| TC36 |
10/30/2009 |
TVA |
Settling Basins Maintenance and Clean Out Plan |
3 |
| TC37 |
10/23/2009 |
TVA |
Revised Cenosphere Collection Area Consolidation Work Plan Signed Version |
5 |
| TC38 |
11/10/2009 |
TVA |
Lime Test Work Plan
(approved) |
4 |
| TC39 |
11/10/2009 |
TVA |
Time Critical Ash
Removal from East Embayment Work Plan (Approved document) |
7 |
| TC40 |
11/10/2009 |
TVA |
Technical Memorandum KIF Rainfall Sampling Events |
5 |
| TC41 |
11/11/2009 |
TVA |
Approved SWPP addendum |
2 |
| TC42 |
11/20/2009 |
TVA |
Ball Field Modifications - Road & Drainage Work Plan |
5 |
| TC43 |
11/25/2009 |
TVA |
Excavator Removal Work Plan |
32 |
| TC44 |
11/30/2009 |
TVA |
Construction of lateral expansion facilities - Phase 1 Work Plan |
4 |
| TC45 |
12/03/2009 |
TVA |
Addendum to Construction of Lateral Expansion Facilities Phases 1 Approved Version |
11 |
| TC46 |
12/02/2009 |
TVA |
Dike C Risk Mitigation Work Plan |
64 |
| TC47 |
12/11/2009 |
TVA |
Mechanical Dewatering for Treatment of Ash Pond FinesWork Plan. |
8 |
| TC48 |
12/09/2009 |
TVA |
Rail Modifications Work Plan |
6 |
| TC49 |
12/10/2009 |
TVA |
Relic Area Piezometer Installation Work Plan |
9 |
| TC50 |
08/16/2010 |
TVA |
Quality Assurance Project Plan for the TVA Kingston Ash Recovery Project(Approved) |
227 |
| TC51 |
1/8/2010 |
TVA |
Settling Areas 1A & 2A Maintenance and Clean Out WorkPlan |
5 |
| TC52 |
1/7/2010 |
TVA |
New Sluice Trench Road Work Plan |
43 |
| TC53 |
1/18/2010 |
TVA |
Addendum to Ash Stacking Height in Processing Area Work Plan (with attatchment) |
43 |
| TC54 |
1/19/2010 |
TVA |
Approval to move 20 inch dredge to section 4 |
1 |
| TC55 |
1/21/2010 |
TVA |
Railroad Modification Work Plan |
27 |
| TC56 |
1/22/2010 |
TVA |
Lime Application in Ballfield |
4 |
| TC57 |
2/18/2010 |
TVA |
Ash Pond Mechanical Dredging Work Plan |
6 |
| TC58 |
2/26/2010 |
TVA |
Ball Field Reconfiguration Work Plan |
11 |
| TC59 |
2/26/2010 |
TVA |
Skimmer Wall Debris Removal Work Plan |
5 |
| TC60 |
3/2/2010 |
TVA |
Construction Operation of Excavation Workign Platform Extended Platform on Lateral Expansion Work Plan |
8 |
TC61 |
3/4/2010 |
TVA |
Test Embankment Buttress Work Plan, Revision 0 |
60 |
TC62 |
3/5/2010 |
TVA |
Weir 1 Removal Work Plan |
8 |
TC63 |
3/15/2010 |
TVA |
Technical Memorandum Concerning Accuracy of Dredge Control Data Surface. |
8 |
TC64 |
3/18/2010 |
TVA |
Valley Area 2 Temp Storage R1 |
18 |
TC65 |
3/24/2010 |
TVA |
Time-Critical Concurrence - Completion of Northern Portion of the East Embayment |
16 |
TC66 |
3/26/2010 |
TVA |
Construction Support Geotechnical Investigation of East Dike Work Plan |
7 |
TC67 |
3/29/2010 |
TVA |
Time Critical Concurrence for Dredge Areas G-64 to G69 |
25 |
TC68 |
3/30/2010 |
TVA |
Stantec Error Correction to Addendum 001 to Quality Control Plan |
11 |
TC69 |
3/31/2010 |
TVA |
Time Critical Concurrence - To the east of Grids A45, 46 and 47(approved) |
1 |
TC70 |
3/31/2010 |
TVA |
North Embayment Ash Consolidation Work Plan, Revision 4 |
5 |
TC71 |
3/31/2010 |
TVA |
Memorandum Concerning Change in location of Air Monitoring Stations |
3 |
TC72 |
4/12/2010 |
TVA |
Construction_Operation of Excavation_Working Platform Extended Platform on Lateral Expansion Revision 1 |
11 |
TC73 |
4/12/2010 |
TVA |
Storage of Mechanically Dred Ash Storage Work Plan Rev 2 |
5 |
TC74 |
4/12/2010 |
TVA |
Time-Critical Concurrence - Ash Pond Material to be put on Dike D bank |
4 |
TC75 |
4/13/2010 |
TVA |
Central Area Recontour Work Plan |
8 |
TC76 |
4/13/2010 |
TVA |
Time-Critical Concurrence-Emory River, Segment Above Segment 5, Dredge Areas B-112, B-114 to B-118 |
11 |
TC77 |
4/13/2010 |
TVA |
Time-Critical Concurrence-Rookery Island |
9 |
TC78 |
4/13/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas D-1 to 8 |
11 |
TC79 |
4/16/2010 |
TVA |
North Embayment Underpass Work Plan, Revision 1 |
37 |
TC80 |
4/16/2010 |
TVA |
Skimmer Wall Debris Removal Work Plan - Rev. 4 |
10 |
TC81 |
4/16/2010 |
TVA |
Lateral Expansion Platform Lime Treatment Work Plan |
4 |
TC82 |
4/23/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment 1, E-40 to E-43 |
8 |
TC83 |
4/28/2010 |
TVA |
Dredge Plan Addendum - Completion of Time Critical Removal Action |
48 |
TC84 |
4/28/2010 |
TVA |
Dike C Buttress Work Plan |
53 |
TC85 |
4/30/2010 |
TVA |
Time Critical Removal Action Completion Report for River System Phase II Nature and Extent of Ash Investigation |
63 |
TC86 |
4/30/2010 |
TVA |
Time-Critical Concurrence-Emory River, Segment Above Segment 5, Dredge Areas D100 to D-104 |
8 |
TC87 |
4/30/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment Above Segment 5, Dredge Areas A-100 to A-102 |
7 |
TC88 |
4/30/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment 1, Dredge Areas D-39 and D-40 |
4 |
TC89 |
5/3/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment Above Segment 5, Dredge Areas B-111 and C-112 |
6 |
TC90 |
5/7/2010 |
TVA |
Filter Press Demobilization Work Plan |
22 |
TC91 |
5/7/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment 1, D-44 to D-47 and E-44 To E-47 |
4 |
TC92 |
5/7/2010 |
TVA |
Time-Critical Concurrence-Emory River, Segment Above Segment 5, Dredge Areas B-103 and B-104 |
4 |
TC93 |
5/7/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment 3, C-57 and C-58 |
4 |
TC94 |
5/7/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment 1, C-49 to C-50, D-48 to D-51, E-48 to E-51 and F-50 to F-51 |
3 |
TC95 |
5/13/2010 |
TVA |
Time-Critical Concurrence-Emory River, Segment Above Segment 5, Dredge Areas portions of grid E-125, grid E-126, grid A-126, grid A-125 |
6 |
TC96 |
5/13/2010 |
TVA |
Time-Critical Concurrence Emory River, Above Segment 5, B-105 through B-107 |
4 |
TC97 |
5/14/2010 |
TVA |
Time Critical Concurrence for the Southern Portion of the East Embayment |
59 |
TC98 |
5/14/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 2, C-55, C-56, D-55, D-56,E-52 to E-56 and F-52 to F-56 |
95 |
TC99 |
5/14/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas B-121 through B-123 |
7 |
TC100 |
5/14/2010 |
TVA |
Time-Critical Concurrence- Emory River Segment 5 Dredge Areas A-1 to A-4 B-1 to B-4 |
9 |
TC101 |
5/17/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas A-20 through A-22 |
4 |
TC102 |
5/17/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas A-8, B8 through B-18, C-2, C-3 and C-15 |
4 |
TC103 |
5/17/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 1, Dredge Areas B-47, C-35 through C-42, C-47 & C-48, D-31 through D-35 |
5 |
TC104 |
5/17/2010 |
TVA |
Time-Critical Concurrence Emory River, Above Segment 5, B-100 through B-102 |
4 |
TC105 |
5/21/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas B-121 through B-123 |
7 |
TC106 |
5/21/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment 5, A-127, A-128, B-127, B-128, C-125 through C-128, D-125 & D-126 |
17 |
TC107 |
5/21/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment 4, D-66, E-63 through E-66, F-63 through F-70 |
15 |
TC108 |
5/21/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 3, D-57 and D-58 |
4 |
TC109 |
5/21/2010 |
TVA |
Time-Critical Concurrence Emory River, Segment 5, A-5 through A-7, A-9 through A-11 |
4 |
TC110 |
5/21/2010 |
TVA |
Time-Critical Concurrence Emory River, Above Segment 5, D-109, D-110, C-109 |
4 |
TC111 |
5/21/2010 |
TVA |
Time-Critical Concurrence Emory River, Above Segment 5, C-104, C-105 |
4 |
TC112 |
5/21/2010 |
TVA |
Time-Critical Concurrence Emory River, Above Segment 5, C-119 through C-122, D-119 through D-122 |
4 |
TC113 |
5/21/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 5, A-18 and A-19 |
4 |
TC114 |
5/21/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment 5, A-127, A-128, B-127, B-128, C-125 through C-128, D-125 & D-126 |
4 |
TC115 |
5/25/2010 |
TVA |
Time Critical Concurrence - Emory River, Segment Above Above Segment 5, Emory River mile 6 to 5.9 |
4 |
TC116 |
5/25/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment 2, G-53 to G-56 |
21 |
TC117 |
5/25/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment 1, B-34, B-35, C-31 through C-34 |
36 |
TC118 |
5/25/2010 |
TVA |
Time-Critical Concurrence Emory River, Above Segment 5, D-111 to D-113 |
11 |
TC119 |
5/25/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 5, C-106 through C-108, D-105 through D-108 |
4 |
TC120 |
5/25/2010 |
TVA |
Time Critical Concurrence - Emory River Segment Above Segment 5, B-125, B-126, C-123 to C-126 and D-123, D-124 |
23 |
TC121 |
5/25/2010 |
TVA |
Time-Critical Concurrence Emory River, Segment 4, D-67 through D-71 and E-67 through E-71 |
13 |
TC122 |
5/25/2010 |
TVA |
Time-Critical Concurrence-Emory River Segment 3, D-59 and D-60, E-57 to E-60, F-57 to F-60 and G-57 to G-59 |
39 |
TC123 |
5/25/2010 |
TVA |
Time Critical Concurrence - Emory River Segment 5, A-12 through A-17 |
33 |
TC124 |
5/25/2010 |
TVA |
Time-Critical Concurrence Emory River, Above Segment 5, C-116 to C-118 and D-116 to D-118 |
27 |
TC125 |
5/27/2010 |
TVA |
Sevenson Filter Press Demobilization Work Packages 2 and 3 |
64 |
TC126 |
5/27/2010 |
TVA |
Dredge Demobilization Work Plan |
32 |
TC127 |
5/28/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 1, B-27. C-27, and D-27 |
6 |
TC128 |
5/28/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas B-5 through B-7 and C-4 through C-7 |
6 |
TC129 |
5/28/2010 |
TVA |
Time Critical Concurrence- Emory River, Segment 5, A-23 |
6 |
TC130 |
6/1/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas A-24 and A-25, B-25 and B-26, C-23 through C-26 and D-25 |
21 |
TC131 |
6/1/2010 |
TVA |
Time Critical Concurrence- Emory River Above Above Segment 5, Area 2, Emory River Mile 5.9 to 5.4 |
50 |
TC132 |
6/1/2010 |
TVA |
Time Critical Concurrence- Emory River, Segment 1, B-33 |
21 |
TC133 |
6/1/2010 |
TVA |
Time-Critical Concurrence Emory River, Segment Above Above 5, Area 4, Emory River mile 4.6 to 4.2 |
37 |
TC134 |
6/3/2010 |
TVA |
Time-Critical Concurrence Emory River, Segment Above Above 5, Area 3, Emory River Mile 5.1 to 4.8 |
61 |
TC135 |
6/3/2010 |
TVA |
Time-Critical Concurrence Emory River, Above Segment 5, C-100 through C-103 |
14 |
TC136 |
6/3/2010 |
TVA |
Time Critical Concurrence - Emory River, Segment Above Above Segment 5, Emory River mile 4.2 to 4.1 |
17 |
TC137 |
6/3/2010 |
TVA |
Time-Critical Concurrence- Emory River, Segment 5, B-19 through B-24 |
32 |
TC138 |
6/3/2010 |
TVA |
Corrective Action Plan for January 2010 Air Audit |
8 |
TC139 |
6/23/2010 |
TVA |
Heavy Equiment Demobilization Plan |
30 |
TC140 |
6/25/2010 |
TVA |
Time-Critical Concurrence - East of Dike 2 |
15 |
TC141 |
6/25/2010 |
TVA |
Time Critical Concurrence - Emory River, Segment East of Dike 2, Grids 28B1 and 29B1 |
3 |
TC142 |
6/25/2010 |
TVA |
Time-Critical Concurrence - Emory River, Segment East of Dike 2, Grid 36a1 and 36B1 |
1 |
TC143 |
6/25/2010 |
TVA |
Time Critical Concurrence - Emory River, Segment “East of Dike 2”, Grids 37A1 through 37D1 |
15 |
TC144 |
6/25/2010 |
TVA |
TVA Quaterly Expenditure Report for period ending March 31, 2010 |
81 |
TC145 |
7/7/2010 |
TVA |
Time-Critical Concurrence - Emory River, Segment East of Dike 2, Grids 38A1 through 42A1 |
10 |
TC146 |
7/7/2010 |
TVA |
Critical Concurrence - Emory River, Segment East of Dike 2, Grid 33A1 |
3 |
TC147 |
7/7/2010 |
TVA |
Time-Critical Concurrence - Emory River, Segment East of Dike 2, Land |
5 |
TC148 |
7/7/2010 |
TVA |
Time-Critical Concurrence - East of Dike 2, North Point and Road to East Embayment |
6 |
TC149 |
7/7/2010 |
TVA |
Time-Critical Concurrence - Emory River, Segment East of Dike 2 , Grid 33A1 |
3 |
TC150 |
7/7/2010 |
TVA |
Time- Critical Concurrence - Emory River, Segment 1, Grids B-40 & B-41 |
11 |
TC151 |
7/7/2010 |
TVA |
Time-Critical Concurrence for the Emory River, Segment 1, Grids B-36 through B-39 |
20 |
TC152 |
7/7/2010 |
TVA |
Time Critical Concurrence - Emory River, Segment 1, Grids B-42 & B-43 and C-43 |
16 |
TC153 |
7/7/2010 |
TVA |
Time Critical Concurrence - Emory River, Segment 1, Grid B44 to B-46 and C-44 to C-46 |
16 |
TC154 |
7/7/2010 |
TVA |
Time - Critical Concurrence - Emory River, Segment East of Dike 2, Grid 29A1 |
3 |
TC155 |
7/7/2010 |
TVA |
Time-Critical Concurrence - Emory River, Segment East of Dike 2, Grids 31-B1 to 35-B1 and 34-A1 and 35-A1 |
7 |
TC156 |
7/7/2010 |
TVA |
Approved Time-Critical Concurrence - Emory River, Segment East of Dike 2, Grids 29C1, 29D1, 29E1, 30 C1 and 30 D1 |
15 |
TC157 |
7/7/2010 |
TVA |
Approved Time Critical Concurrence Emory River Segment 1, Grids B-28 through B-30, C-28 through C-30 and D-28 through D-30 |
25 |
TC157A |
7/7/2010 |
TVA |
Time Critical Concurrence - Emory River, Segment East of Dike 2, Grids 30A1 and 31A1 |
3 |
TC158 |
8/3/2010 |
TVA |
Aquarius Debris Removal Demobilization Work Plan |
9 |
TC159 |
8/3/2010 |
TVA |
Work Plan for Removal of Cantilevered Sheet Piling Wall, Revision 3 |
67 |
TC160 |
8/5/2010 |
TVA |
Support Services Equipment Demobilization Work Plan |
5 |
TC161 |
8/23/2010 |
TVA |
Cenosphere Recovery Demobilization Work Plan |
5 |
TC162 |
8/26/2010 |
TVA |
Time-Critical Concurrence – “Bob Summers’ Road” area East of Dike 2 |
57 |
| TC163 |
8/30/2010 |
TVA |
Dike 2 Remediation Work Plan |
52 |
TC164 |
7/7/2010 |
TVA |
Aquarius Debris Removal Demobilization Work Plan |
9 |
TC165 |
9/14/2010 |
TVA |
Addendum to the Aquarius Debris Removal Demobilization Plan Decontamination of AM501 and AM504 |
7 |
TC166 |
9/21/2010 |
TVA |
Mactec Demobilization Plan |
12 |
TC167 |
12/6/2010 |
TVA |
Aquarius Debris Removal Demobilization Plan Deontamination of AM 501 and AM 504 |
4 |
TC168 |
2/7/2010 |
TVA |
Dike C Buttress Work Plan - Segment A |
60 |
TC 169 |
04/07/2001 |
TVA |
Intake Channel Bridge Removal Work Plan |
12 |
TC170 |
05/20/2011 |
TVA |
Siphon Installation/Diffuser Removal Work Plan |
12 |
TC171 |
05/27/2011 |
TVA |
Intake Channel Causeway Removal Work Plan |
15 |
TC172 |
06/09/2011 |
TVA |
Dike C Buttress Work Plan − Segment B |
185 |