tva logoTennessee Valley Authority
Kingston Ash Release

Non-Time Critical Administrative Record Documents Available for Public Review and Comment

The Tennessee Valley Authority is working with the Environmental Protection Agency to recover the site of the Kingston Fossil Plant ash spill. As part of that process, important site documents have been placed in the Administrative Record and are available for public review.  The Administrative Record includes documents that form the basis for the selection of the methods TVA is using to remove ash from the river and area east of Dike 2. Documents in the Administrative Record may include, but are not limited to, inspection reports, test results, the Action Memorandum, and work plans. All interested persons are encouraged to review the documents.

Site documents can be read and reviewed on this Web site or at the following locations:

Kingston Public Library
1004 Bradford Way
Kingston, Tennessee
(865) 376-9905

These same documents are available on computer disk at the following location:

Harriman Public Library
601 Walden Street
Harriman, Tennessee
(865) 882-3195

TVA conducts public comment periods to solicit public input on important site documents and the site recovery process.  To find out what public comment periods are in process and how to participate, please click here.

Index of Non-Time Critical Documents in Adminstrative Record

Nbr Date Author Agency Title Pages

NTC1

06/10/2009 TVA Test Embankment Program 6
NTC2 10/16/2009 TVA EE/CA Work Plan 136
NTC3 1/19/2010 TVA Engineering Evaluation/Cost Analysis (EE/CA) Various
NTC4 1/22/2010 TVA EECA Work Plan Responsiveness Summary 36
NTC5 5/18/2010 TVA Action Memorandum and Responsiveness Summary to the EE/CA 107
NTC6 5/21/2010 TVA Transmittal Cover for Regulatory Submittal - Deep Soil Mixing Field Demonstration Work Plan, Revision 4 17
NTC7 6/3/2010 TVA Approved Final NTCRA for the River System Sampling and Analysis Plan 258
NTC8 6/3/2010 TVA Transmittal Cover for Regulatory Submittal - Ash Leaching Test Plan 12
NTC9 7/22/2010 TVA Memo to Craig Zeller re NTC water 1
NTC10 7/26/2010 TVA Surface Water Monitoring Plan for the Emory, Clinch, and Tennessee Rivers 47
NTC11 7/26/2010 TVA Site Dust Control and Air Monitoring Plan 35
NTC12 8/10/2010 TVA Central Area Re-contouring Work Plan Rev 5 10
NTC13 8/23/2010 TVA Non-Time-Critical Removal Action Work Plan for the Embayment Dredge Cell 57
NTC14 9/10/2010 TVA Interim Dredge Cell Ash Stacking and Instrumentation Design Package 40
NTC15 9/20/2010 TVA Non-Time-Critical Removal Action for the Swan Pond Embayment Ash Removal Design Package (Revison 3 Drawings Only) 30
NTC16 09/20/2010 TVA Site Storm Water Management Plan  49
NTC17 12/14/2010 TVA Gupton Farm Road Removal Work Plan 6
NTC18 01/06/2011 TVA Non-Time-Critical Removal Action Field Change Notice For Lime Addition 5
NTC19 03/21/2011 TVA Non-Time Critical Work Plan for Ash Stablization Demonstration in Support of Dredge Cell Ash Stacking 5
NTC20 04/05/2011 TVA Pine Ridge Borrow Study Work Plan 6
NTC21 04/11/2011 TVA Non-Time Critical Work Plan for the Perimeter Stabilization Field Demonstration in Support of Dredge Document no. EPA-AO-034 8
NTC 22 04/25/2011 TVA Gupton Borrow Area Work Plan 7
NTC 23 05/17/2011 North Embayment Non-Time Critical Concurrence 12
NTC 24 07/05/2011 TVA North Embayment Non-Time Critical Concurrence Grids 4-E and 3-J 18
NTC 25 07/07/2011 TVA Non-Time Critical Lateral Expansion (Cell 4) Ash Stacking 90% Review 253
NTC 26 07/13/2011 TVA Non-Time Critical Site Storm Water Management Plan, Revision 2 44
NTC 27 08/02/2011 TVA Non-Time Critical Removal Action Surface Water Monitoring Plan 35
NTC 28 08/09/2011 TVA Non-Time-Critical Perimeter Containment North Dredge Cell (Dike C) Segment 1 Design Package and the Revised Technical Specifications and Quality Control Plan for Perimeter Wall Stabilization 510
NTC 29 08/22/2011 TVA Semi-Annual Performance Audits, Network Review, and Data Review of the Ambient Air Monitoring Network 13
NTC 30 08/22/2011 TVA Non-Time-Critical Removal Action
River System Sampling and Analysis Plan
Task Completion Technical Memorandum
Amphibian Sampling
39
NTC 31 08/22/2011 TVA Non-Time-Critical Removal Action
River System Sampling and Analysis Plan
Task Completion Technical Memorandum
Piscivorous and Herbivorous Bird Egg Sampling
32
NTC 32 08/22/2011 TVA Non-Time-Critical Removal Action
River System Sampling and Analysis Plan
Task Completion Technical Memorandum
Groundwater Sampling
186
NTC 33 08/22/2011 TVA Non-Time-Critical Removal Action
River System Sampling and Analysis Plan
Task Completion Technical Memorandum
Surface Water
37
NTC 34 08/22/2011 TVA Non-Time-Critical Removal Action
River System Sampling and Analysis Plan
Task Completion Technical Memorandum
Tree Swallow Sampling
57
NTC 35 08/22/2011 TVA Non-Time-Critical Removal Action
River System Sampling and Analysis Plan
Task Completion Technical Memorandum
Turtle Sampling
44
NTC 36 08/22/2011 TVA Non-Time-Critical Removal Action
River System Sampling and Analysis Plan
Task Completion Technical Memorandum
Fish Sampling
333
NTC 37 08/29/2011 TVA Non-Time Critical Concurrence: Area: 1-A,1-B, 1-C, 1-F, 1-G, 1-H, 2-A, 2-B, 2-D, 2-E, 2-F, 2-G, 2-H, 3-A, 3-B, 3-C, 3-D, 3-E, 3-F west of Clean Water Ditch. 3-G, 3-H, 4-B west of Clean Water Ditch, 4-C & 4-D and delineated area north of Grid 1-B 32
NTC 38 08/30/2011 TVA Non-Time Critical Removal Addendum for Swan Pond Embayment Ash Removal North Embayment Phase 1 Phase 2 Design Drawings 4
NTC 39 09/21/2011 TVA Field Change Notice-034 - Perimeter Wall Stabilization Segment 1 Sta  A161+50 to Sta  179+50 28
NTC 40 09/26/2011 TVA Non-Time-Critical 90% design package ash pond outlet structure 173 pgs
NTC 41 09/27/2011 TVA Non-Time-Critical Concurrence North Embayment Grids S·N, S-M, 6-E, 6·F ,6·L and 7-E covered by the Swan Pond Road stabilization buttress. 26
NTC 42 11/02/2011 TVA Non-Time-Crtiical Concurrence for a portion of the North Embayment Grids 4-H, 4-J, 4-K, 4-L, 5-G, 5-F, 5-E, 5-D, 5-K, 5-L, 5-M, 6-D, 6-K, 6-L and eastern portion of 6-E 86
NTC 43 11/04/2011 TVA Non-Time-Critical Removal Action
River System Sampling and Analysis Plan
Task Completion Technical Memorandum
Aquatic Vegetation and Periphyton Sampling
41
NTC 44 11/07/2011 TVA Non-Time-Critical Removal Action Site Dust Control and Air Monitoring Plan 30
NTC 45 12/12/2011 TVA Non-Time-Critical Removal Action for the River System. Supplemental Ash Leaching Test Results 113
NTC 46 12/12/2011 TVA Non-Time Critical Concurrence: Area: The North Embayment Grids 5-N, 5-J, 5-H, 5-A, 6-C, 6-B, 6-J, 6-H, 6-G, 7-E, 7-D, 7-C, 7-B, and 7-A. 104
NTC 47 12/12/2011 TVA Non-Time Critical Concurrence: Area: The North Embayment Grids 3-F, 4-A, 4-G, 5-B, and 5-C 46
NTC 48 12/12/2011 TVA Non-Time Critical Removal (Phase III) Action for the Swan Pond Embayment Ash Removal Design package. 32
NTC 49 12/12/2011 TVA Non-Time Critical Concurrence: Area: The North Embayment Grids 7-G, 7-H, 7-J, 7-K, 7-L 37
NTC 50 12/19/2011 TVA Perimeter Wall Stabilization (PWS) Segment 1A Test Parcel No. 11 (TP11) Non-Time Critical Completion Concurrence and Acceptance Kingston Perimeter Containment - Segment 1 (RDP-0113-E) 5
NTC 51 12/19/2011 TVA Perimeter Wall Stabilization (PWS) Segment 1A Test Parcel No. 13 (TP13) Non-Time Critical Completion Concurrence and Acceptance Kingston Perimeter Containment - Segment 1 (RDP-0113-E) 5
NTC 52 12/19/2011 TVA Perimeter Wall Stabilization (PWS) Segment 1A Test Parcel No. 9 (TP9) Non-Time Critical Completion Concurrence and Acceptance Kingston Perimeter Containment - Segment 1 (RDP-0113-E) 5
NTC 53 02/01/2012 TVA Perimeter Wall Stabilization Segment 1B Test Parcel No. 29 Completion Concurrence and Acceptance 5
NTC 54 02/02/2012 TVA Swan Pond Road (Segment 7) Perimeter Containment Design (90% Submittal) 418
NTC 55 02/06/2012 TVA Non-Time-Critical Removal Action Design Package North Wall Segment 8 Perimeter Containment Design 90 percent 164
NTC 56 03/01/2012 TVA Non-Time-Critical North and Central Dredge Cell (Cells 2 and 3) Closure  140
NTC 57 03/08/2012 TVA Approved concurrence for the Perimeter Wall Stabilization, Test Parcel 31 for Segment 1A 5
NTC 58 03/21/2012 TVA Approved concurrence for Test Parcel 10 of Segment 1 of PWS 5
NTC 59 03/21/2012 TVA Approved concurrence for Test Parcel 31 of Segment 1 of PWS 5
NTC 60 04/30/2012 TVA Non-Time-Critical Removal Action Surface Water Monitoring Plan 37
NTC 61 05/8/2012 TVA Perimeter Wall Stabilization (PWS) Segment 1 Test Parcel No. 20 (TP20) Completion Concurrence and Acceptance Kingston Perimeter Containment – Segment 1 (RDP-0113-E) 5
NTC 62 05/8/2012 TVA Non-Time-Critical Removal Action for the River System Sampling and Analysis Plan (SAP) Supplement A 94
NTC 63 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Surface Water 35
NTC 64 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Amphibian Sampling 39
NTC 65 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Piscivorous and Herbivorous Bird Egg Sampling 32
NTC 66 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Groundwater Sampling 187
NTC 67 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Tree Swallow Sampling 57
NTC 68 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Turtle Sampling 44
NTC 69 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Fish Sampling 383
NTC 70 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Raccoon Sampling 48
NTC 71 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Ash Deposits, Submerged Sediment, and Seasonally-Exposed Sediment 194
NTC 72 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Aquatic Vegetation and Periphyton Sampling 41
NTC 73 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Sediment Bioassay and Porewater 86
NTC 74 05/9/2012 TVA River System Sampling and Analysis Plan Task Completion Technical Memorandum Benthic Invertebrate Sampling 103
NTC 75 06/11/201 TVA Approved acceptance and concurrence for TP 801 of Segment 8 of the PWS 5
NTC 76 06/11/201 TVA Approved acceptance and concurrence for TP 802 of Segment 8 of the PWS

5

NTC 77 06/11/2012 TVA Approved Concurrence and Acceptance for TP 803 of Segment 8 of the PWS 5
NTC 78 06/11/2012 TVA Approved Concurrence and Acceptance for TP 804 of Segment 8 of the PWS 5
NTC 79 06/19/2012 TVA Approved Transmittal Cover for Regulatory Submittal for Kingston Fossil Plant - NTC RDP Perimeter Containment Lateral Expansion- Segment 2 170
NTC 80 06/21/2012 TVA Approved Transmittal Cover for Regulatory Submittal for Kingston Fossil Plant - Sluice Trench Outlet Piping 29
NTC 81 07/23/2012 TVA Approved Lateral Expansion Closure design package 160
NTC 82 08/06/2012 TVA Approved - Transmittal Cover for Regulatory Submittal for KRP - NTC 90 % Design for Ash Pond Ash Stacking 53
NTC 83 08/10/2012   River System Engineering Evaluation/Cost Analysis Various
NTC 84 08/20/2012 TVA Storm Water Pollution Prevention Plan – North Borrow Area 59
NTC 85 08/27/2012 TVA Field Change Notice for Cold Joint Definition 254
NTC 86 08/27/2012 TVA General Mitigation Plan for Cold Joints, Defects and Other Nonconforming Soil- Cement Walls 34
NTC 87 11/07/2012 TVA River System Action Memorandum 55
NTC 88 11/20/2012 TVA Approved plan for Entrance Restoration Work Plan 5
NTC 89 12/07/2012 TVA 90 percent Design for Segments 3 and 4 Perimeter Containment - Approved 1917
NTC 90 12/10/2012 TVA Approved concurrence for Grids 9-A, 10-B and Portions of Grids 9-B and 10-C in the Middle Embayment 28
NTC 91 12/17/2012 TVA Approved Embayment Restoration Grading and Weirs 17
NTC 92 12/19/2012 TVA Approved - Non-Time-Critical Concurrence Middle Embayment Grids 8B-D, 9 B-D and 10 C – E 22
NTC 93 12/20/2012 TVA Site Dust Control and Air Monitoring Plan 31
NTC 94 03/07/2013 TVA Approved-Revised Surface Water Monitoring Plan (February 2013)  23
NTC 95 03/14/2013 TVA Removal Action Work Plan for the River System 37
NTC 96 05/30/2013 TVA NTC River System Long-Term Monitoring Sampling and Analysis Plan 68
NTC 97 06/21/2013 TVA Non-Time-Critical Concurrence Middle Embayment Grids 8G--N, 9F--H, and parts of 8E, 8F, 9E, 10F, 10G, and 10H 27
NTC 98 08/12/2013 TVA 90% Design for South Dredge Cell (Cell 1) and Ash Pond Closure - Approved 155
NTC 99 09/09/2013 TVA Approved Site Storm Water Management Plan Revised 50
NTC 100 09/09/2013 TVA Revised Embayment Restoration Grading and Weirs 140
NTC 101 11/04/2013 TVA Data Management Plan Revised (2013) 83

 

 

Page Updated December 5, 2013 3:10 PM