Environmental Policy and PrinciplesAir QualityLand ManagementWater QualityEnvironmental ReportsEnvironmental ServicesNews ReleasesReturn to Environmental Main

Watts Bar Nuclear Steam Generator Replacement

Rhea County, Tennessee

Steam generators, like any other heat exchanger or large piece of equipment, wear or degrade with usage. The resulting repairs would increase with time leading to larger losses of generation and lost revenue to TVA. Ultimately, this situation could lead to the shutdown of the unit. Replacement of the steam generators would maintain the generation capability of WBN Unit 1. TVA accepted public comment from January 28 to February 28, 2005, on the draft of the Environmental Assessment. After consideration of comments received, TVA has prepared a Final Environmental Assessment (FEA) which considered the impacts of the No Action Alternative and the Proposed Action Alternative, and issued a Finding of No Significant Impact (FONSI).

Documents

PDF files require Adobe Acrobat Reader.

Final Environmental Assessment (553 kb, PDF)

Finding of No Significant Impacts (102 kb, PDF)

Contact

For additional information or to obtain copies of the FEA and FONSI, please contact:
Diedre B. Nida
TVA Environmental Policy and Planning
1101 Market Street, MR 2T
Chattanooga Tennessee, 37402
Phone: 423-751-4430
Fax: 423-751-3230

top of page