Severcorr 2 - Catalpa Creek - Lowndes County Power Supply Improvement Project
Lowndes County, Mississippi
On January 30, 2008, TVA issued a final environmental assessment and finding of no significant impact for the SeverCorr 2 - Catalpa Creek - Lowndes County Power Supply Improvement Project. This project involves the construction and operation of two new switching stations and 4.8 miles of new 161-kilovolt (kV) transmission lines, upgrading 10.3 miles of existing transmission line from 46-kV to 161-kV operation, and expanding an existing substation in Lowndes County, Mississippi.
The proposed power supply improvements would address the electrical needs of an expansion of the SeverCorr steel mill, a new PACCAR, Inc., plant, and anticipated reliability problems resulting from other industrial load growth in the Golden Triangle area. They would also provide a connection to 4-County Electric Power Association’s planned Catalpa Creek Substation.
Documents
PDF files require Adobe Acrobat Reader.
Finding of No Significant Impact (PDF, 106 kb)
Environmental Assessment (PDF, 2.4 mb)
Contacts
For more information or to request a printed copy of these documents, contact:
Kelly R. Baxter
Environmental Stewardship and Policy
Tennessee Valley Authority
400 West Summit Hill Drive
Knoxville, TN 37902
E-mail: krbaxter@tva.gov