Ranger, North Carolina SubstationConstruction of a 161-kV delivery point SummaryThis final Environmental Assessment addresses the proposal by the Tennessee Valley Authority (TVA) to serve Blue Ridge Mountain Electric Membership Corporation’s (BRMEMC) planned substation at Ranger by building an approximately 4.9-mile, 161-kilovolt (kV) transmission line connection from TVA’s existing Murphy-Weaver 161-kV transmission line located east of Ranger, Noerh Carolina, to BRMEMC’s planned Ranger Substation. DocumentsPDF files require Adobe Acrobat Reader. Finding of No Significant Impact (PDF, 28 kb)
ContactsFor more information, or to request a printed copy of these documents, contact: Anita E. Masters, Senior NEPA Specialist
|
|