Ranger, North Carolina Substation

Construction of a 161-kV delivery point

Summary

This final Environmental Assessment addresses the proposal by the Tennessee Valley Authority (TVA) to serve Blue Ridge Mountain Electric Membership Corporation’s (BRMEMC) planned substation at Ranger by building an approximately 4.9-mile, 161-kilovolt (kV) transmission line connection from TVA’s existing Murphy-Weaver 161-kV transmission line located east of Ranger, Noerh Carolina, to BRMEMC’s planned Ranger Substation.

Documents

PDF files require Adobe Acrobat Reader.

Finding of No Significant Impact (PDF, 28 kb)
Environmental Assessment (PDF, 1.1 Mb)

Figure 1.1 (PDF, 1.5 Mb)
Figure 1.2 (PDF, 288 kb)

Contacts

For more information, or to request a printed copy of these documents, contact:

Anita E. Masters, Senior NEPA Specialist
Environmental Policy and Planning
Tennessee Valley Authority
1101 Market Street, MR 2T
Chattanooga, TN 37402
E-mail: aemasters@tva.gov

top of page