tva logoTennessee Valley Authority

Northwest Tennessee Regional Port Authority

Lake County, Tennessee

TVA has issued an Environmental Assessment (EA) Adoption and Finding of No Significant Impact (FONSI) for making a loan to the Northwest Tennessee Regional Port Authority to assist in the purchase of land for the development of a new port facility on the Mississippi River at Cates Landing, Tennessee. The U.S. Army Corps of Engineers (USACE) prepared an EA as part of a Detailed Project Report in August 2004. TVA reviewed the USACE EA, concurred with its findings, and determined that the proposed TVA loan would not be a major federal action significantly affecting the environment. The port and industrial park together could ultimately create more than 5,600 jobs over time.

Documents

PDF files require Adobe Acrobat Reader).

Finding of No Significant Impact (PDF, 270 kb)

USACE EA (PDF, 477 kb)

Figures (1.4 mb)

A copy of the USACE Detailed Project Report and supporting documentation (referenced attachments) can be provided upon request.

Contact information

For additional information contact:

Ruth M. Horton
TVA NEPA Services
400 West Summit Hill Drive, WT 11D
Knoxville, Tennessee 37902
Phone: 865-632-3719
Fax: 865-632-3451
rmhorton@tva.gov