Coming Clean on Waste

photo of researchersTVA’s generation of low-level radioactive waste fluctuates as a result of individual facilities’ needs, but the agency remains committed to the goal of decreasing its overall production of such waste.

Like many other entities, TVA is hampered in its disposal of radioactive waste by a lack of economical licensed-and-permitted disposal facilities. The agency has Nuclear Regulatory Commission approval to store some levels of radioactive waste onsite until a better disposal solution is available.

chart of Hazardous Waste Generated

Click chart for raw data.

Increases resulted from the following large-scale remediation projects: Power Service Center (1999); Tellico Battery Project and Environmental Research Center (2000).

For small amounts of hazardous waste—lead paint, solvents, and certain heavy metals, for example—TVA maintains its own storage and disposal facility. Larger quantities of hazardous waste are shipped directly to approved contractors when possible.

TVA lacks a standardized, agencywide removal plan for materials like polychlorinated biphenyl (PCB). Most high-risk PCB equipment has been removed or retrofilled, but a recent shift in the EPA’s definition of what constitutes PCB materials has intensified the need for a systematic phase-out plan.

Another area in which a removal plan is needed centers on such substances as ozone-depleting refrigerants. To comply with U.S. Presidential Executive Order 13148, some TVA business units are already phasing out the procurement of these materials; the agency will have a comprehensive phase-out plan in place before the 2010 deadline set by the order.