Increased Landfill Gas Generating Capacity at Chestnut Ridge Sanitary Landfill
Anderson County, Tennessee
On December 20, 2010, TVA completed an environmental assessment (EA) and issued a finding of no significant impact (FONSI) for a proposed power purchase agreement for electricity generated at the Chestnut Ridge Sanitary Landfill.
TVA currently purchases electricity generated from landfill gas at the Chestnut Ridge landfill. WM Renewable Energy LLC is planning to construct and operate two additional landfill gas-fueled generators, for a total of six generators with a total capacity of 4.8 megawatts at the facility. The new generators would be installed in a previously disturbed area adjacent to the existing generators. The EA evaluates the potential environmental impacts of the construction of the new generators and associated auxiliary systems and the operation of the enlarged generating facility.
Documents
PDF files require Adobe Acrobat Reader.
Finding of No Significant Impact (PDF, 107 kb)
Environmental Assessment (PDF, 147 mb)
Attachments to the Environmental Assessment (PDF, 2.4 MB)
Contact
For more information or a printed copy of the documents, contact:
Arianne L. Balsom, Contract NEPA Specialist
Tennessee Valley Authority
400 West Summit Hill Drive, WT 11D
Knoxville, Tennessee 37902
albalsom@tva.gov