tva logoTennessee Valley Authority

Blue Ridge Mountain Electric Membership Corporation Proposed Substation

Chatuge Reservoir, Towns County, Georgia

Update

On April 15, 2009, TVA issued a finding of no significant impact (FONSI) and a supplement to the final environmental assessment (FEA) issued March 11, 2009. The supplemental environmental assessment (SEA) provides additional information about one of the potential substation sites suggested by the Towns County Homeowners Association. The new FONSI and SEA are available below in the Documents section.


On March 11, 2009, TVA issued a FONSI and released a FEA that relates to a request by Blue Ridge Mountain Electric Membership Corporation (BRMEMC) for TVA fee property and a permanent easement located within TVA Tract XCHR-12R (also known as Parcel 52) on Chatuge Reservoir in Towns County, Georgia.

In this FEA, TVA examines the potential impacts of selling at public auction approximately 1.4 acres of property, of granting the successful bidder a permanent easement and approval of a Section 26a permit, and of the resulting construction and operation of the substation and new transmission line.

TVA held an open house on Thursday, November 13, 2008, to receive comments on the BRMEMC request.  In addition, TVA received comments on a draft environmental assessment (DEA) through November 24 by mail, phone, fax, and an online comment form via its Web site.  Comments received on the DEA have been incorporated into the FEA. 

The FEA and FONSI are presented below.

Documents

PDF files require Adobe Acrobat Reader.

April 15, 2009, Finding of No Significant Impact (84 kb)

April 2009 Supplemental Environmental Assessment (1.25 mb)

March 11, 2009, Finding of No Significant Impact (109kb)

March 2009, Final Environmental Assessment (PDF, 794 kb)

Attachment A – Application, Proposed Drawings, Maps, and Needs Analysis (PDF, 2.7 mb)

Attachment B – Public Scoping Comments and TVA Responses, Public Notice, and Correspondence (PDF, 2.2 mb)

Attachment C – Public Comments Pertaining to BRMEMC Received During the Mountain Reservoirs Land Management Plan Comment Period (August 15-September 29, 2008) (PDF, 205 kb)

Attachment D – TVA Notice to Hold Open House on November 13, 2008, and Public Comments With TVA Responses on the Draft Environmental Assessment (PDF, 302 kb)

Attachment E – Georgia State Clearinghouse Memorandum and Georgia Department of Natural Resources Memorandum (PDF, 4.5 mb)

Attachment F – BRMEMC Alternative Substation Locations and Transmission Line Routes (PDF, 1.3 mb)

Attachment G – Towns County Homeowners Association Alternative Substation Locations (PDF, 325 kb)

Attachment H – TVA Analytical Methodologies (PDF, 535 kb)

Attachment I – TVA General and Standard Conditions (PDF, 1.5 mb)

Contact

Kelly R. Baxter, NEPA Specialist
Tennessee Valley Authority
400 West Summit Hill Drive, WT 11D
Knoxville, TN 37902
krbaxter@tva.gov
Phone: 865-632-2444; Fax: 865-632-3451

           
Content for id "future1" Goes Here
Content for id "future2" Goes Here
Content for id "future3" Goes Here